In this study, 1.2333 cold work tool steel and cast iron (GG 25) were simultaneously melted in different furnaces to fabricate composite die mold used in sheet metal forming industry. To enhance the metallurgical bond between two components of composite part, the pouring temperature of cast iron was assessed just above the solidus temperature, then metallurgically prepared cast iron was poured on to the cast tool steel. The temperature and casting parameters were monitored and simulated. Experimental and simulation results were compared, finally the optimum parameters and casting route were revealed.
JavaScript is turned off in your web browser. Turn it on to take full advantage of this site, then refresh the page.