PL EN


Preferences help
enabled [disable] Abstract
Number of results
2016 | 53 | 3 | 354-366
Article title

Establishment of Critical Causal Factors for Electrical Cost Estimating Techniques

Content
Title variants
Languages of publication
EN
Abstracts
EN
Cost estimating techniques are approaches towards delivering reliable estimates for any projects or endeavour. However, the usage of the different estimating techniques available depends on prevailing circumstances revolving around such project while the reliability and accuracy of each of the estimating techniques quite differ from each other. This study had through literature review identified six (6) electrical cost estimating methods and through a structured questionnaire assessed the causal factors influencing the usage of the six estimating methods. Data were retrieved from 80 respondents and analysed. The results of the study indicate the most critical causal factors as incomplete details in electrical working drawings, the absence of electrical design drawings and unclear/ambiguous electrical specifications. The study also proffered probable solutions to five of the most critical causal factors. In addition, site-observed productivity constants of electrical technicians at three different residential project sites were obtained which will serve as a valuable cost tool for estimators when carrying out electrical cost estimating jobs. The findings of the research have considerable implications for the education, training and practice of estimators in the construction industry.
Year
Volume
53
Issue
3
Pages
354-366
Physical description
Contributors
  • Department of Quantity Surveying, Federal University of Technology, P.M.B. 704, Akure, Nigeria, toolawumi@futa.edu.ng
References
  • [1] Abubakar M., Ibrahim Y.M., Kado D., Bala K., (2014). Contractors Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry; Computing in Civil and Building Engineering (ASCE Journal)
  • [2] AcqNotes (2015a). Cost Estimating: Parametric Cost Estimating. <22 September 2015> <http://acqnotes.com/acqNote/parametric-cost-estimating>
  • [3] AcqNotes (2015b). Financial Management: Cost Estimating Methods. <22 September 2015> <http://acqnotes.com/acqnote/careerfields/cost-estimating-methods>
  • [4] AcqNotes (2015c). Cost Estimating: Engineering Cost Estimating. <22 September 2015> <http://acqnotes.com/acqnote/tasks/engineering-cost-estimating>
  • [5] Chan, D.W.M (1998). Modelling construction durations for public housing projects in Hong Kong. HKU Scholars Hub. http://hdl.handle.net/10722/34830
  • [6] Chancellor, W., (2015). Drivers of productivity: a case study of the Australian construction industry, Construction Economics and Building, 15(3), 85-97. DOI: http://dx.doi.org/10.5130/AJCEB.v15i3.4551
  • [7] Cobanoglu, C., Warde, B., and Moreo, P.J. (2001). A comparison of mail, fax, and web-based survey methods, International Journal of Market Research, 43(4), 441-455.
  • [8] Dick Billows (2014). Parametric Estimating. <22 September 2015> <http://4pm.com/parametric-estimating/>
  • [9] Electricity Consumer Safety Regulation (2015), ‘Public consultation draft’, pp. 4 <September 16, 2015> <http://goo.gl/qFdf1n>
  • [10] Explorable.com (2009). Non-Probability Sampling. <August 19, 2015> <https://goo.gl/a9Mljm>
  • [11] Fahad Usmani(2012) Three Tools to Estimate Activity Duration. <22 September 2015> <http://pmstudycircle.com/2012/06/three-tools-estimate-activity-duration/>
  • [12] Keraminiyage, K, Amaratunga D, Haigh R. and Perera, R.S. (2009), Selection of Electrical Accessories: A “Cost Modelling” Approach. Research Institute for the Built and Human Environment, The University of Salford, UK. http://goo.gl/x5nPBl
  • [13] Kirkham, R. (2007) Ferry and Brandon's Cost Planning of Buildings, 8th edition, Wiley Blackwell, Oxford
  • [14] Krieg, E. F. (1999). Biases induced by coarse measurement scales. Educational and Psychological Measurement, 59(5), 749-766. DOI: 10.1177/00131649921970125
  • [15] Lawrence, M. (1993) The which? Book of Wiring &Lighting, Consumer’s Association, London
  • [16] Lowe, D.J. (1998). The development of expertise in early stage cost estimating through experiential learning. In Proceedings of the RICS Construction and Building Research Conference, Oxford Brookes University, 2P3 September, Edited by M Keeping and D Shiers, ISBN 1P873P640P23P4
  • [17] Markgraf B. (2014a). Project management cost estimating techniques. <22 September 2015> <http://smallbusiness.chron.com/project-management-cost-estimating-techniques-40508.html>
  • [18] Markgraf B. (2014b). What Are Reasons for Cost Overruns in Project Management? <22 September 2015> <http://smallbusiness.chron.com/reasons-cost-overruns-project-management-63225.html>
  • [19] McDonald, H. and Adam, S. (2003). A comparison of online and postal data collection methods in marketing research, Marketing Intelligence and Planning, 21(2), 85-95. DOI: 10.1108/02634500310465399
  • [20] Medak K. (2014). A Project manager's guide to cost estimating and cost planning. <22 September 2015> <http://www.framegroup.com.au/cost-estimating-and-planning/>
  • [21] Moser, C.A. and Kalton, G. (1971): Survey Methods in Social Investigation. Heinemann Educational, London.
  • [22] Nguyen, Nhat H., and Skitmore, Martin and Wong, Johnny K.W., (2009). Stakeholder impact analysis of infrastructure project management in developing countries: a study of the perception of project managers in state-owned engineering firms in Vietnam. Construction Management and Economics, 27(11). pp. 1129-1140. DOI: 10.1080/01446190903280468
  • [23] NIQS (2008) Building and Engineering Standard Method of Measurement (BESMM 3), the 3rd ed., The Nigerian Institute of Quantity Surveyors; ISBN: 998-36754-7-8.
  • [24] Olawumi T.O., Ogunsemi D.R., and Ogunsina S. (2016) Modelling the Costs of Final Sub-Circuits in Residential Electrical Installations (under review). Journal of Construction Engineering and Management
  • [25] PMG (2015) Project Management Estimating Tools & Techniques. <22 September 2015> <http://www.projectmanagementguru.com/estimating.html>
  • [26] PMS (2014). Project Cost Estimating Tools & Techniques. <22 September 2015> <http://www.project-management-skills.com/project-cost-estimating.html>
  • [27] Sharma R. and McDonough M.(2013). Tools Used to Estimate Costs in Project Management. <22 September 2015> <http://www.brighthubpm.com/project-planning/54986-tools-used-to-estimate-costs-in-project-management/>
  • [28] Shuttleworth, M. (2008). Survey Research Design. https://explorable.com/survey-research-design
  • [29] Simon, R. and Andy, D, (2010). “Specialist Costs: M & E Services”. <Dec. 16th, 2012> <http://goo.gl/oRLTL0>
  • [30] Soutos, M. and Lowe, D.J. (2011). Elemental cost planning: current UK practice and procedure. Journal of Financial Management of Property and Construction, 16(2), DOI:10.1108/13664381111153123
  • [31] The Association for the Advancement of the Cost Engineering (2004) Parametric Cost Estimating Model for Buildings (online) <http://www.aacei.org/technical/costmodels/BuildingModel.shtml>
  • [32] Washington State Department of Transportation [WSDOT], (2015). Cost Estimating Manual for Projects [pdf]. <22 September 2015> <http://www.wsdot.wa.gov/publications/manuals/fulltext/M3034/EstimatingGuidelines.pdf>
  • [33] Wayne J.D. (2015). Electrical Estimating Methods, (4th ed.). John Wiley and Sons Inc. ISBN: 978-1-118-76698-9
Document Type
article
Publication order reference
Identifiers
YADDA identifier
bwmeta1.element.psjd-c9d8c2b6-b29f-43c6-99ac-81bc2893790b
JavaScript is turned off in your web browser. Turn it on to take full advantage of this site, then refresh the page.