Article title

Analysis of the Application of Horizontal Directional Drilling

Content
Title variants
Languages of publication
EN
Abstracts
EN
Construction works are often considered to be very intrusive for the environment. Project designers assume deep excavations, or a complete replacement of the ground within the investment, which sometimes changes the initial conditions drastically. The problem started to appear in places, where the terrain is complicated and the excavation is burdensome. Some of state authorities do not agree to carry out works by open excavation. Such as crossing the river, running a network under the street in the city center, or a necessity to cross the protected natural area. In a case of linear facilities, it is possible to minimize interference for the natural environment. An example is crossing through a river, where instead of running a network on the bottom, a controlled drilling can be used. Modern technology allows for streamlining of execution works in line with pro-ecological policy.
Year
Volume
135
Pages
173-187
Physical description
Contributors
  • Faculty of Civil and Environmental Engineering, Gdansk University of Technology, 11/12, Gabriela Narutowicza Street, 80-233 Gdansk, Poland
References
  • [1] Allouche, Lueke, Ariaratnam, Horizontal Directional Drilling: Profile of an Emerging Industry. Journal of Construction Engineering and Management, Vol. 126 (1), 2000, pp. 68-76
  • [2] X. Wang, R.L. Sterling. Stability analysis of a borehole wall during horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 22, 2007, pp. 620-632
  • [3] M. Polak, A. Lasheen. Mechanical modelling for pipes in horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 16, 2001, pp. 47-55
  • [4] M. E. Baumert, E.N. Allouche. Installation Loads on Pipelines Installed Using HDD. CSCE Conference, London, Ontario, 2000, pp. 173-180
  • [5] L. Cai, G. Xu, M. A. Polak, M. Knight. Horizontal directional drilling pulling forces prediction methods – A critical review. Tunnelling and Underground Space Technology, Vol. 69, 2017, pp. 85-93
  • [6] X. Yan, S. T. Ariaratnam, S. Dong, C. Zeng, Horizontal directional drilling: State-of-the-art review of theory and applications. Tunnelling and Underground Space Technology, Vol. 72, 2018, pp. 162-173
  • [7] A. G. Chehab, J. D. Moore. Parametric study examining the short and long term response of HDPE pipes when installed by horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 25, 2010, pp. 782-794
  • [8] Ariaratnam, Stauber, Bell, Harbin, Canon. Predicting and controlling hydraulic fracturing during horizontal directional drilling. Proceedings of the ASCE International Conference on Pipeline Engineering and Construction 2, 2003, pp. 1334–1345
  • [9] Ding P, Yan XZ, Yang XJ (2007) The mechanical parameter research of horizontal directional drilling crossing project. J SWPU 29: 152–155
  • [10] Lueke, Ariaratnam. Surface heave mechanisms in horizontal directional drilling. J Constr Eng Manag, Vol. 135, 2005, pp. 540–547
  • [11] T. Zayed, M. Mahmoud. Data acquisition and factors impacting productivity of Horizontal Directional Drilling (HDD). Tunnelling and Underground Space Technology, Vol. 33, 2013, pp. 63-72
  • [12] A. P. Jaganathan, J. N. Shah, E. N. Allouche, M. Kieba, C. J. Ziolkowski, Modeling of an obstacle detection sensor for horizontal directional drilling (HDD) operations. Tunnelling and Underground Space Technology, Vol. 20, 2011, pp. 1079-1086
  • [13] B. Shu, B. Ma. The return of drilling fluid in large diameter horizontal directional drilling boreholes. Tunnelling and Underground Space Technology, Vol. 52, 2016, pp. 1-11
  • [14] S. Cherkashin. Installation of the Pipelines Made of Ductile Iron (DI) with the Usage of Horizontal-directional Drilling Technique (HDD) for Water Supply Treatment Service and Sewerage Pipelines Construction and Reconstruction. Procedia Engineering, Vol. 165, 2016, pp. 717-725
  • [15] X. Yan, B. Ma, C. Zeng, Y. Liu. Analysis of formation fracturing for the Maxi-HDD Qin River crossing project in China. Tunnelling and Underground Space Technology, Vol. 53, 2016, pp. 1-12
  • [16] L. Cai, M. A. Polak. A theoretical solution to predict pulling forces in horizontal directional drilling installations. Tunnelling and Underground Space Technology, Vol. 83, 2019, pp. 313-323
  • [17] W. Yiquan, L. Guining, X. Laingkui, Z. Panjun, M. Naibing. Technical difficulties and innovation in the Jiangyin Yangtze River crossing project of 3300 m HDD. Natural Gas Industry, Vol. 1, 2014, pp. 119-124
  • [18] E. N. Allouche. Implementing quality control in HDD projects - a North American prospective. Tunnelling and Underground Space Technology, Vol. 16, 2001, pp. 3-12
  • [19] X. Zhu, L. Dong, H. Tong. Failure analysis and solution studies on drill pipe thread gluing at the exit side of horizontal directional drilling. Engineering Failure Analysis, Vol. 33, 2013, pp. 251-264
  • [20] X. Zhu, Q. Yi, „Research and application of reaming subsidence control in horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 75, 2018, pp. 1-10
  • [21] J. A. Cholewa, R. W. I. Brachman, I. D. Moore. Stress–strain measurements for HDPE pipe during and after simulated installation by horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 25, 2010, pp. 773-781
  • [22] M. Rabiei, Y. Yi, A. Bayat, R. Cheng. Simple methods for fluidic drag estimation during pipe installation via HDD. Tunnelling and Underground Space Technology, Vol. 76, 2018, pp. 172-176
  • [23] H. Akbarzadeh, A. Bayat. Investigating ASTM F 1962 arching factor for Polyethylene pipes installed by Horizontal Directional Drilling. Tunnelling and Underground Space Technology, Vol. 39, 2014, pp. 50-57
  • [24] H. Baik, D. M. Abraham, S. Gokhale. A decision suport system for horizontal directional drilling. Tunnelling and Underground Space Technology, Vol. 18, 2003, pp. 99-109
Document Type
article
Publication order reference
Identifiers
YADDA identifier
bwmeta1.element.psjd-a4304014-3956-4220-86a5-1a0b8f5058c5
JavaScript is turned off in your web browser. Turn it on to take full advantage of this site, then refresh the page.