Full-text resources of PSJD and other databases are now available in the new Library of Science.
Visit https://bibliotekanauki.pl

PL EN


Preferences help
enabled [disable] Abstract
Number of results
2016 | 130 | 6 | 1439-1442

Article title

KASS v.2.2. Scheduling Software for Construction with Optimization Criteria Description

Authors

Content

Title variants

Languages of publication

EN

Abstracts

EN
The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building production. The minimal time, the minimal slack of brigades, the minimal slacks of the chosen working brigade and costs of the transfer operation of working fronts are included in operational research criteria between work centers. It is possible to enter data into the program both by hand as well as to load the Excel from files, similarly is with results, they are presented on-screen as well as a possibility of enrolling them in the existing file Excel. An element is very valid for it since allows for further simple processing of received results. In providing software for performing operational research calculations a technique of the complete review and simulation technology are being exploited. A program describing algorithms is used which will stay in the article as well as shown computational examples will remain.

Keywords

EN

Contributors

  • Warsaw University of Technology, Civil Engineering Department, Warsaw, Poland

References

  • [1] N. Ibadov, J. Kulejewski, M. Krzemiński, AIP Conf. Proc. 1558, 1298 (2002), doi: 10.1063/1.4825749
  • [2] M. Krzemiński, AIP Conf. Proc. 1648, 600005 (2015), doi: 10.1063/1.4912837
  • [3] M.L. Pinedo, Scheduling: Theory, Algorithms, and Systems, Springer, New York 2012
  • [4] M.L. Pinedo, Planning and Scheduling in Manufacturing and Services, Springer, Dordrecht 2009
  • [5] E. Zondervan, T.P.J. van Boekel, J. Fransoo, A.B. de Haan, Comput. Aided Chem. Eng. 29, 925 (2011), doi: 10.1016/B978-0-444-53711-9.50185-1
  • [6] A. Madureira, I. Pereira, N Sousa, P. Avila, J. Bastos, in: Computational Intelligence for Engineering Systems, Vol. 46 of the series Intelligent Systems, Control and Automation: Science and Engineering, 2010, p. 34, doi: 10.1007/978-94-007-0093-2
  • [7] M. Krzemiński, E. Krasnodębska, in: Theoretical Foundations Of Civil Engineering Polish-Ukrainian Transactions, Vol. 22, Warsaw 2014, p. 189 (in Polish)
  • [8] P. Kowalik, M. Krzemiński, Logistyka, 4218 (2015) (in Polish)
  • [9] M. Krzemiński, A. Wypysiak, Proced. Eng. 91, 400 (2014), doi: 10.1016/j.proeng.2014.12.083

Document Type

Publication order reference

Identifiers

YADDA identifier

bwmeta1.element.bwnjournal-article-appv130n628kz
JavaScript is turned off in your web browser. Turn it on to take full advantage of this site, then refresh the page.