As of 1 April 2026, the PSJD database will become an archive and will no longer accept new data. Current publications from Polish scientific journals are available through the Library of Science: https://bibliotekanauki.pl
Zinc oxide derived from processing of the slime obtained in an industrial process of electrolytic zinc obtaining was leached with the aqueous sulfuric acid solution. The effect of temperature and time on the extent of leaching was determined. The conditions lead to zinc recovery of about 90%. It was found that the extent of arsenic leaching did not depend upon the time and temperature of leaching. Next the conditions of the solution purification procedure were determined. It was found that jarosite formation as well as the degree of arsenic removal is connected with trivalent iron concentration in the solution.
BOL-THERM Sp. z o.o., ul. Kolejowa 37, 32-332 Bukowno, Poland
References
Jha, M. K., Kumar, V. & Singh, R. J., (2001). Review of hydrometallurgical recovery of zinc from industrial wastes, Resources Conservation, Recycling, 33, 1-22.
Jarosiński, A, (2007). Exemplary solutions of zinc raw material processing, Waste recycling XI, Kosice, 6-7 December, 177-184.
Malinowski, Cz., Małecki, S. & Jochymek, Ł. (2007), Alternative way of zinc secondary material processing, IX International Conference "Theoretical and practical problems of management of metallurgical and industrial wastes", 16-18 May, 89-95, AGH Faculty of Non-ferrous, 89-95 (in Polish).
Łętowski, F, (1975). Basic of hydrometallurgy. WNT Warszawa (in Polish).
Dutrizac, J.E, (1984). The behavior of impurities during jarosite precipitation, Ed. Bautista R. G. "Hydrometallurgical process fundamentals" Part I, Plenum Press, New York and London, 125-169.